October 15, 2026
On September 26, 2026, SANDAG opened a 1.1-mile paved segment of the Inland Rail Trail between Mar Vista Drive and Civic Center Drive in Vista. With it, you can now walk, bike or roll more than 12 continuous miles without sharing space with cars, from the Escondido Transit Center through San Marcos to the Civic Center Station in Vista. The protected path still ends about two miles short of East Broadway, though. For a Vista resident, the trail is most useful once you know the short street routes that close that gap, and the City of Vista has already published them.
The new segment follows the SPRINTER tracks. The Coast News reported that construction started in June 2024, wrapped up in September, and cost about $30 million, paid for through TransNet and grants from the California Transportation Commission's Active Transportation Program. SANDAG says the path is fully ADA-compliant and has new lighting along its whole length. That matters on fall evenings, when daylight runs out earlier. Building it took a lot of grading, because parts of the rolling ground sat as much as 25 feet above the rails.
The new mile also adds a feature at its western end. At the corner of Mar Vista Drive, SANDAG built a small pocket park with a rest area. Drought-tolerant plantings and drainage channels that filter stormwater run along the route.
The trail has been built in pieces over many years:
| Phase | Segment | Opened |
|---|---|---|
| Prework | 7 miles, Escondido to San Marcos | 2009 |
| Phase 1 | 1 mile, North Pacific Street to Cherimoya Drive | 2017 |
| Phase 2 | 2.5 miles, Cherimoya to York Drive, plus Woodland to Mar Vista Drive | 2021 |
| Phase 3 | Mar Vista Drive to Civic Center Drive | September 2026 |
| Phase 4 | Civic Center Drive to North Drive, about 2 miles | In design |
Each phase so far has stretched the trail east and south toward San Marcos and Escondido. The stretch that would carry it through the middle of Vista toward the Oceanside segment is the one still unbuilt.
Vista put out its own directions for September's Cyclovia, the car-free downtown festival it held the same Saturday the new segment opened. Those directions double as the clearest guide to getting from the trail to Historic Vista Village. They give three starting points, two of them tied to the trail and one at the downtown SPRINTER stop:
| Starting point | Distance to downtown | By bike | On foot | Main streets |
|---|---|---|---|---|
| Trail exit at Phillips Street and Mar Vista Drive | About 2 miles | 10 minutes | 40 minutes | Mar Vista Dr., S. Santa Fe Ave., E. Broadway |
| Civic Center–Vista SPRINTER station, 810 Phillips Street | 1.4 miles | 8 minutes | 24 minutes | Civic Center Dr., Eucalyptus Ave., N. Citrus Ave. |
| Vista Transit Station, 240 N. Santa Fe Road | 0.3 miles | 3 minutes | 8 minutes | Vista Village Dr., N. Santa Fe Ave. |
The Civic Center route is shorter, but it means leaving the trail at its very last stop. The Mar Vista route lets you get off a little earlier and follow a single road nearly all the way to E. Broadway.
Here is the City's route from the trail to the Village:
If you start at the Civic Center–Vista station, the City's directions say to turn right on Civic Center Drive toward Natal Way, then left on Eucalyptus Avenue and right onto N. Citrus Avenue. Another option is to stay on Civic Center Drive, go left on S. Santa Fe Avenue, continue past the roundabouts, and turn right on E. Broadway. That alternate shares its last stretch of S. Santa Fe and E. Broadway with the Mar Vista route. Once you've ridden it, the Village is an easy 10-minute add-on to any trip on the trail.
The route ends among the walkable downtown spots that the travel magazine Islands named in its write-up on Vista, which the Downtown Vista guide summarized in August 2026. The places with the most to offer after a ride:
A loop works well on a Saturday. Ride west on the trail from San Marcos, get off at Mar Vista Drive, take the five turns above to E. Broadway, and eat brunch on a patio before heading back.
The trail runs right beside the SPRINTER, so you can ride one way and take the train home. North County Transit District allows bikes on board in the designated bike areas, as long as there's room and the bike is secured. E-bikes are allowed if their batteries meet NCTD's sealed-battery rules. Folding bikes are allowed too. Gas-powered bikes and several other types are not.
Parking is free at SPRINTER stations except Cal State San Marcos and San Marcos Civic Center, and NCTD says the lots are for transit customers. If you'd rather drive to the trail and ride from there, keep that rule in mind, since NCTD's parking information covers stations and doesn't list a dedicated trail lot.
The City also runs an e-bike safety training and rebate program. Vista residents who finish the course, which includes hands-on safety training and a community ride, can apply for a rebate of up to $450 on an e-bike purchase. With a two-mile street ride between the trail and downtown, that course is a practical fit.
The next few months give you several reasons to use the trail-to-Village route:
Fright Night and Cowboy Christmas both run into the evening. The new segment's lighting helps on the trail itself, but the last two miles are on city streets, so bike lights are a smart idea for the ride home.
The trail will eventually cover 21 continuous miles. The missing piece is Phase 4, about two miles from Civic Center Drive to North Drive. SANDAG describes those as two of Vista's busiest streets, and it estimates the phase at about $34.2 million.
The money has been the problem. The Coast News reported in June that SANDAG gave back roughly $11.7 million in state construction funding because design couldn't move fast enough to meet the state's deadline for using it. SANDAG set aside about $900,000 to push design toward the 60 percent mark and plans to apply again in a future funding cycle. SANDAG's project page lists Phase 4 as in final design with budget and schedule still being worked out. In the same June report, The Coast News said Vista officials disputed the "final design" label and that design had not yet reached 60 percent. No source gives a completion date.
At the September ribbon-cutting, SANDAG Chair and Solana Beach Mayor Lesa Heebner said the new segment "provides a truly unique and safe experience for bike riders and pedestrians along the railroad tracks that would otherwise be inaccessible to the public," according to The Coast News.
If the new trail mile has you thinking about how your daily routes could look in a different part of North County, from the SPRINTER line to downtown Vista and beyond, Jill Vodicka is glad to walk through it with you. Let's Connect.
Stay up to date on the latest real estate trends.
Get expert assistance in determining current property value, crafting a competitive offer, and writing and negotiating a strong contract. I’ll guide you through market analysis, pricing strategy, inspections, and closing—ensuring every step is handled with clarity and confidence. Contact me today to get started.